Stressing sequence of steel cable-stayed bridges built by cantilevering
2015
The construction of cable-stayed bridges by cantilevering implies several changes of geometry, stress and strain patterns during the assemblage of segments. The main target to be satisfied in the construction process is the achievement of the required final geometry and of a convenient state of stress for self-weight and sustained loads. The sequence of stay stressing and the values of prestressing forces at each stage of segment assembling have the main role for reaching the desired result of design, due to the large redundancy of cable-stayed structures.Among the different procedures proposed in the literature for initial cable force determination, the Partial Elastic Scheme (PES) Method …